18-Count Display
STEP 3. Installation of Display
1: Check the Scope of Work under Buyer’s Custom Fields in your Work Order. If something needs to be moved, do so now (ask a store employee for help if it’s merchandise). If an existing PrimoWater display needs to be moved, you will need to remove all water jugs in order to shift it. The store may receive a unit with different Primo Brands (ie. Poland Springs, Zephyrhills, Deer Park, etc). All instructions are exactly the same regardless of the branding.
2: Slide the display off of the pallet in front of the install location. Move the pallet and pallet jack out of the way of customer traffic while you continue to work.
3: Using a box cutter, remove the plastic wrap from the display.
4: Using wire snips, remove all zip ties from the interior rails.
5: Attach the header to the front top bar using the plastic clips (found in bag shipped inside the display) and aligning the holes.
6: Slide the display into position of the Install Location. If placed next to an existing display, align the front edges and butt it up next to the other display.
7: If there are existing PrimoWater displays with new water jugs, place at least 3 five-gallon jugs from the existing display over to the new display that you just installed.
8: Install a Pump Rack or Pricing Signage if included in the shipment.
➡ Pump Rack: a wire basket to be hung on the side of the display.
➡ Pricing Signage: stickers with pricing to be placed in bottom right corner of the header (see photo).
9: Clean up the site and return the pallet and pallet jack to the Receiving Area. You will need to return to the install location to complete Step 5 (Install Verification Form).
Return to main Installs page to continue instructions.